During some testing with 2 stacked switches, I was able to simulate a failure by issuing the command:
reload slot 2 -> This will reload the module 2 switch.
switch# reload ?
LINE Reason for reload
at Reload at a specific time/date
cancel Cancel pending reload
in Reload after a time interval
slot Slot number card
standby-cpu Standby RP
Switch# sh switch det
Switch/Stack Mac Address : 0021.XXXX.XXXX
H/W Current
Switch# Role Mac Address Priority Version State
----------------------------------------------------------
*1 Master 0021.XXXX.XXXX 15 1 Ready
2 Member 0022.XXXX.XXXX 1 1 Ready
Stack Port Status Neighbors
Switch# Port 1 Port 2 Port 1 Port 2
--------------------------------------------------------
1 Down Down None None
2 Ok Ok 1 1